Voltage Quality Improvement using UPS systems
Gallery
Project overview
In a liquefied natural gas power generation plant in La Paz B.C., a power quality study was carried out due to problems with interruptions and damaging of electronic components. A double-conversion UPS system solution was specified. The procurement, installation and commissioning of the UPS systems was carried out, separating loads and installing additional panels to protect only the critical equipments of the plant.
- ClientNew Fortress Energy
- Industry
- LocationLa Paz B.C.S.
- Year
Let’s build your solution together
Let us know your requirements.We’ll follow up shortly with the best way forward.