Voltage Quality Improvement using UPS systems

Project overview

In a liquefied natural gas power generation plant in La Paz B.C., a power quality study was carried out due to problems with interruptions and damaging of electronic components. A double-conversion UPS system solution was specified. The procurement, installation and commissioning of the UPS systems was carried out, separating loads and installing additional panels to protect only the critical equipments of the plant.

  • Client
    New Fortress Energy
  • Industry
  • Location
    La Paz B.C.S.
  • Year

Let’s build your solution together

Let us know your requirements.We’ll follow up shortly
with the best way forward.