Replacement of old oil transformers to new dry type transformers

Project overview

A spectroscopy test was carried out during preventive maintenance with Megger's IDAX equipment to identify the moisture in the paper of the substations, detecting that they were with a high concentration of moisture. It was decided to leave them out of operation and they were replaced by the supply and installation of Siemens dry transformers in epoxy resin.

  • Client
    Heineken
  • Industry
  • Location
    Navojoa Sonora
  • Year

Let’s build your solution together

Let us know your requirements.We’ll follow up shortly
with the best way forward.