A study was carried out in the 230 kV power substation to detect the general values to verify compliance with the network code, where the study was later carried out in each of the distribution substations to size the harmonic filters and capacitor banks. The procurement, installation and commissioning of harmonic filters was carried out in 15 substations to raise the power factor and reduce harmonic currents.